Renewable energy developer · Design office · all of Poland

We develop solar farms and energy storage across Poland

We lease land and develop solar farm and energy storage projects — from grid-capacity analysis to the building permit application.

I own land — see the terms 📐 I need a design

I'm looking for projects →

16 yearsof team experience
5,000+ MWof projects in development
600 MWlargest project
Biurko projektanta: arkusze planu zagospodarowania terenu magazynu energii, schemat przyłączenia, laptop z programem CAD i kask

Design office in the NRG+ group

We design your installation — from grid connection conditions to the building permit

Documentation for energy storage, solar farms, hybrid plants and main connection points is prepared by Projekt Energia — a design office and subsidiary of NRG Plus. We take the project from site analysis to the building permit application; the decision is issued by the competent authority.

  • Capacity analysis and grid connection applications
  • Site development plan and building design
  • Detailed design, main connection points and MV/HV substations
  • Building permit and design supervision

Order a design Projekt Energia office ↗

What we do

We run projects from site selection and grid-capacity analysis, through approvals, to the building permit application.

Solar farms

From small installations to multi-hectare farms: site analysis, grid connection conditions, environmental decision and building permit.

Energy storage

Battery energy storage systems (BESS) next to main grid substations — plots from 0,3 ha.

Hybrids and new technologies

Solar, wind and energy storage sharing one grid connection (cable pooling) — better use of the allocated capacity.

Loading the map…

Where we are looking for land

Check your plot

Find your plot on aerial photos and submit it for a free analysis. You can add several plots at once.

The precinct (obręb) is usually the name of the village or part of town, as in the land register extract. You can also enter the full ID (e.g. 040301_2.0005.179/18), just the number (we search the precinct in the map centre) or an address.

or click a plot on the map

Your plots

0

    Nothing added yet. Search for a plot or click it on the map.

    What the free analysis includes
    • You will immediately see the plot number, precinct, municipality and area (ULDK register, GUGiK) and whether it lies in an area where we are looking for land.
    • Our specialist will check the distance to the substation and the available capacity published by the grid operator, the zoning or general plan, nature protection, flood risk, utilities, access and soil classes — using data from GUGiK, GDOŚ, ISOK, planning registers and grid operators.
    • Without the grid operator it is not possible to confirm whether and on what terms a connection will be possible. Only the connection conditions issued at the investor’s request settle this.

    For landowners

    Lease your land for a solar farm or energy storage

    Steady long-term rent for land that earns little today. We make a one-off payment when the lease is signed, and from the start of construction we pay the full rent — a year in advance and indexed to inflation every year. We handle the paperwork.

    Energy storage — rentfrom PLN 80,000/ha/year
    Solar farm — rentfrom PLN 15,000/ha/year
    Lease term25–29 years
    Plot sizefrom 0,3 ha

    The rate depends on how attractive the land is.

    I own land — see the terms

    Indicative rent — scenario

    Annual rent at the minimum rate—

    This is an indicative scenario, not an offer: the minimum rate from the table × area. We will quote a rate for a specific plot after analysing it (grid capacity, zoning plan, access, plot shape). Until construction starts, a one-off payment made on signing applies; details, including indexation, are set out in the lease.

    1. 01You offer your plot

      A plot number or a click on the map is enough.

    2. 02We check the potential

      Capacity at the nearest substation, zoning plan, site constraints.

    3. 03We sign the lease

      25–29-year lease. On signing we make a one-off payment for the project preparation period.

    4. 04Design and construction

      We prepare the design and apply for permits. From the start of construction we pay the full rent a year in advance, and we compensate for crops lost during construction.

    For investors

    Buying, selling and developing solar and BESS projects

    Years of experience and industry contacts let us optimise projects and sell them at the best price.

    Let's talkbiuro@nrgplus.pl

    1. 01Acquisition of PV and BESS projects with grid connection conditions and ready-to-build (RTB) status
    2. 02Brokering the sale of solar farm and energy storage projects
    3. 03Project optimisation: plot relocation, negotiations with the grid operator
    4. 04Battery energy storage (BESS) projects from 4 to 600 MW