Solar farms
From small installations to multi-hectare farms: site analysis, grid connection conditions, environmental decision and building permit.
Renewable energy developer · Design office · all of Poland
We lease land and develop solar farm and energy storage projects — from grid-capacity analysis to the building permit application.
Design office in the NRG+ group
Documentation for energy storage, solar farms, hybrid plants and main connection points is prepared by Projekt Energia — a design office and subsidiary of NRG Plus. We take the project from site analysis to the building permit application; the decision is issued by the competent authority.
We run projects from site selection and grid-capacity analysis, through approvals, to the building permit application.
From small installations to multi-hectare farms: site analysis, grid connection conditions, environmental decision and building permit.
Battery energy storage systems (BESS) next to main grid substations — plots from 0,3 ha.
Solar, wind and energy storage sharing one grid connection (cable pooling) — better use of the allocated capacity.
Where we are looking for land
Find your plot on aerial photos and submit it for a free analysis. You can add several plots at once.
The precinct (obręb) is usually the name of the village or part of town, as in the land register extract. You can also enter the full ID (e.g. 040301_2.0005.179/18), just the number (we search the precinct in the map centre) or an address.
Nothing added yet. Search for a plot or click it on the map.
For landowners
Steady long-term rent for land that earns little today. We make a one-off payment when the lease is signed, and from the start of construction we pay the full rent — a year in advance and indexed to inflation every year. We handle the paperwork.
The rate depends on how attractive the land is.
This is an indicative scenario, not an offer: the minimum rate from the table × area. We will quote a rate for a specific plot after analysing it (grid capacity, zoning plan, access, plot shape). Until construction starts, a one-off payment made on signing applies; details, including indexation, are set out in the lease.
A plot number or a click on the map is enough.
Capacity at the nearest substation, zoning plan, site constraints.
25–29-year lease. On signing we make a one-off payment for the project preparation period.
We prepare the design and apply for permits. From the start of construction we pay the full rent a year in advance, and we compensate for crops lost during construction.
For investors
Years of experience and industry contacts let us optimise projects and sell them at the best price.
Occasional updates: renewables market, lease rates and new areas where we are looking for land.